3000kg/h Liquid CO2 making device

FOB Reference Price:Get Latest Price
$3,880,000.00 - $4,180,000.00 / Plants | 1 Plant/Plants (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Shanghai, China (Mainland)
Brand Name:
Shineworld
Model Number:
3000kg/h Liquid
Usage:
Air Seperation Plant
Kind:
CO2 making plant
Name:
SW 1500 CO2 plant solution
Supply Ability
Supply Ability:
1000 Plant/Plants per Year
Packaging & Delivery
Packaging Details
standard export package
Port
Sahanghai

The technical performance of the device:carbon dioxide gas recovery production capacity

3000kg/h

carbon dioxide recovery rate

98%

the normal working pressure

2.0MPa

liquid carbon dioxide storage temperature

 -18

after the purity of carbon dioxide recovery device

99.97%-99.99%

covers an area of

1500m2 (user provided topographic map, layout of equipment)

pressure

greater than or equal to 0.2MPa

power

3P-380-50Hz

the installed capacity

800KW

Raw material

Natural

Gas

1800-1900Nm3/h

 

 

 

No.

Name

Material

Qty.

1

Burner and device

 

2

2

Cooling tower

S30408,packing included

1

3

Absorber tower

S30408

1

4

Regeneration tower

S30408

1

5

Poor-liquid cooler

S30408

1

6

CO2 cooler

S30408

1

7

Heat exchanger for poor and rich water

S30408

1

8

Reboiler

S30408

1

9

Washing liquid cooler

S30408

1

10

Heater for amine recycling

S30408

1

11

Solution tank

Carbon steel

1

12

Washing liquid tank

Carbon steel

1

13

Solution tank

Carbon steel

 

14

CO2 separator

S30408

1

15

Activated carbon filter

Carbon steel

1

16

Induced draft fan

S30408

2

17

Poor liquid pump

 

2

18

Rich liquid pump

 

2

19

Washing pump

 

1

20

Reflux pump

 

1

21

Alkali pump

 

1

22

CO2 compressor

 

1

23

Refrigerator

 

1

24

Regeneration air pump

 

1

25

Buffer

S30408

1

26

Purifing tower

Q345R

2

27

Dryer

Q345R

2

 

 

1,Q:did you offer the whole project design?

    A:Yes!
2,Q:did you do the whole project proposal?

    A:Yes!
3,Q:did you train the operators?

    A:Yes!
4,Q:did you offer the service to run the project after commissioning?

    A:Yes!
5,Q:did you have successful case?

    A:Yes, many country in Europe, Russia, Korea, Middle East, Africa, America area.
6,Q:How long the delivery time:

    A:5 months. and could be negociated.

 

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like