O2-1050 N2-1000 Argon 35 Nm3/h argon making plant

FOB Reference Price:Get Latest Price
$2,480,000.00 - $2,680,000.00 / Plants | 1 Plant/Plants (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Shanghai, China (Mainland)
Brand Name:
Shineworld
Model Number:
ASP-004
Usage:
Air Seperation Plant
Kind:
Air Seperation Plant
Name:
SW 1500 CO2 plant solution
Supply Ability
Supply Ability:
10 Plant/Plants per Year
Packaging & Delivery
Packaging Details
standard export package
Port
Sahanghai

 

 

Production, Purity, Pressure (Outlet the Cold Box):

Model1

medium

Production (Nm3/h)

Purity

Pressure(MpaG)

Oxygen

180±5%

≥99.6%O2

~15

Model2

medium

Production (Nm3/h)

Purity

Pressure(MpaG)

Nitrogen

180±5%

≤10ppm O2

~15

Model3

medium

Production (Nm3/h)

Purity

Pressure(MpaG)

Liquid Oxygen

90±5%

≥99.6%O2

~0.3

Model 4

medium

Production (Nm3/h)

Purity

Pressure(MpaG)

Liquid Nitrogen

100±5%

≤10ppm O2

~0.38

Product Production State(0 ºC, 101.325Kpa)

Start-up pressure

1.2MPa(G)

Running period

12 Months

Start time needed

~10H

 

NO.

ITEM

DESCRIPTION

1

Oil screw air compressor

GA250

2

Air pre-cooler

SDYL-1902/13

3

Oil mist filter

/

4

Molecular sieve purifier

HXK-1902/13

5

Fractionating column

FO-180

6

Turbo expander

/

7

Cryogenic liquid oxygen pump

/

8

Oxygen filling device

10 heads

9

Instrumentation and electrical control system

/

10

Process Pipe

/

11

Freight and packing charge to Shanghai

/

12

Aluminum sheet thermal insulation

/

13

Portable oil content detector

/

14

Carbon dioxide analyzer

/

 
 

No.

Must be the buyer's self-care scope

1.  

Feed air inlet (acquirer should promise the feed air quality is accord with attachment1).

2.  

Engineering design of plant and equipment, including civil works design, public works design, process pipe design and so on.

3.  

All the civil engineering such as factory base, material and construction, incl. lighting, health facility, water supply and drainage, communication, indoor air-condition, fire-fighting, heating, cable trench, cable bearer, buried pipes, embedded part and crane equipment.

4.  

Factory and distillation column, distribution room and high-low equipment, central control room, container outside and lightning-protection of oxygen pipelines, anti-static facilities and ground connection.

5.  

Insulation materials for connecting process pipe of unit equipment

6.  

Transportation and insurance of equipment

7.  

The installation of equipment, auxiliary materials for installation tools, welding rod, derosination and installation, dismounting, the tools for testing pressure and checking test etc.

8.  

The cable between high-low voltage and unit equipment from supplier.

9.  

Instrument air, pressure test gas, materials, oil, water and electricity consumption in air separation engineering installation and commissioning.

10.     

Outside paint of equipment is white, if the user wants to change, the required coating should be provided by buyer.

11.     

Supervision and checking procedures & charges of equipment, pressure pipelines by local technical supervision department.

12.     

Free supply the board and lodging of debugging persons from machine supplier (including the necessarily furniture, kitchen facility and health facility, bathroom, SATV, etc.), communication (including phone and network, etc.), medical treatment, traffic and necessarily working condition and office (including tables and chairs, tool etc.), supply the convenience to borrow technological books and information, supply necessarily temporarily appliances for labor protection.

13.     

Overseas service charge for debugging persons (From domestic departure date to the day leave the buyer's site, US$200 per person a day)

14.     

Acquirer is responsible for applying for visa of debugging persons, physical examination(if country of destination required), traffic from domestic to country of destination (Planes, cars, ships, trains, etc.) and other relevant procedures and charges about going abroad(excluding passport).

 
 

 

 

1,Q:did you offer the whole project design?

    A:Yes!
2,Q:did you do the whole project proposal?

    A:Yes!
3,Q:did you train the operators?

    A:Yes!
4,Q:did you offer the service to run the project after commissioning?

    A:Yes!
5,Q:did you have successful case?

    A:Yes, many country in Europe, Russia, Korea, Middle East, Africa, America area.
6,Q:How long the delivery time:

    A:5 months. and could be negociated.

 